FACTORY APPROVED BY
ISO   WRAP
 

QUALITY MANAGEMENT SYSTEM (QMS)

Our main tradition to offer our customers first quality merchandises. Quality Control programs not only help to spot & reject defective items but more importantly they pinpoint production operations that need special attention. Thereby reducing the number defects in future production.

HOW TO CONTROL QUALITY SYSTEM

1. PIECE GOODS INSPECTION SYSTEMS

During piece goods inspection - we follow some systems

  1. We inspect- at least 10% of the total rolls in the shipment
  2. We select - at least one of the roll each color or more than one roll per color
  3. We indicate as a major defect - i.e. slabs, mixed yarn, hole , needle mark , missing yarn, crease mark, foreign yarn, Shading, oil mark, dirty, dye spot, color out, broken pattern, grain line etc.
2. CUTTING DEPARTMENT QUALITY CONTROL
  1. Fabric Relaxation - we open fabric rolls before 24 hours start fabric spreading, rolls selection with same width & shade dye lot.
  2. We follow - during spreading -- marking placement, running shading, fabric ply tension,
    layer counting, fabric edge controlling. Fabric plies counting. Over lapping & pilling
    direction.
  3. We follow - after cutting - narrow goods, cut pieces checked by original pattern, notches, miss-cut, ragged cutting, Matching plies.
3. IN PROCESS QUALITY CONTROL

Our main motto is to producing good quality merchandises. So we control quality in
process as one of the key.

IN PROCESS AUDITING SYSTEM
  1. To ensure good quality - we provide two nos. inspector for 30-40 machines
  2. To maintain record data - we provide a format against each machine
  3. We make sampling plan with allowable defects
  4. We have written quality standards
  5. We take measurement in critical process
  6. We use arrow sticker to identify defects
  7. We inspect 07 pcs. from per bundle i.e.> 24.pcs
  8. We follow - AQL- 2.5 in process
  9. About reject bundle- the inspector enters the operators name on the four tickets, places these tickets with the rejected bundle & takes the bundle to the sewing supervisor for review. The sewing supervisor explains the problem to the operator, shows the operator how to repair or correct the problem. & instructs the operator to 100% inspect the entire bundle, making all necessary repairs before starting to work another bundle.
RECORD KEEPING IN- PROCEES AUDITING

We maintain a record or report from for each individual process as below:

  1. Date, operator name & time - clock number
  2. Operation number
  3. Sewing supervisor & line number
  4. Daily in process audits showing units inspected & units found defect
  5. We maintain a weekly summary to show total units inspected, total defects found &
    Percent defective
TABLE INSPECTION

To maintaining good quality - we make a inspection report from ''sewing line finish garment'';

  1. Date/hourly production quantity, inspected quantity, rejected quantity & pass quantity
  2. Identify defective & rectified quantity
ACCEPTABLE QUALITY LABEL (AQL) - 2.5

Before start finishing work - we follow AQL system through a format;

  1. Buyer, item, style, Purchase Order, order quantity, audit time, lot quantity, sample quantity, measurement, defect allowed, total defects Percent of defects. Pass/fail
  2. Pass >> allowed for start the finishing work
  3. Fail >> full lot - 100% re-inspection
PRE- FINAL INSPECTION

We make a pre final to avoid as bellows;

  1. Incorrect quantity.
  2. Incorrect price ticket/bar code, hang tag/OTC tag, hanger & sizer cap, garment sticker/poly bag sticker.
  3. Carton - shipping mark printing problem/carton sticker.
  4. Carton not as specified.
  5. Crushed or damaged cartons.
  6. Incorrect pre-pack 1] assortments 2] Amounts 3] Pre- pack stickers

SAFETY HAZARDS ISSUES IN PRODUCTION

To avoid metallic hazards we already provided Metal Detector Machine.
We maintain needle control procedures, broken needle control log with a format.

  1. Factory Name
  2. Country
  3. Section
  4. Date & Time
  5. Operator Name
  6. Machine Type
  7. Needle Size
  8. Buyer
  9. Style No
  10. Signature of Supervisor
  11. Tape complete Needle parts